{"id":4341,"date":"2025-06-11T13:11:37","date_gmt":"2025-06-11T11:11:37","guid":{"rendered":"https:\/\/www.solventa6.com\/nueva-convocatoria-de-ayudas-para-baterias-solares-hasta-el-85-de-subvencion\/"},"modified":"2025-06-25T11:10:38","modified_gmt":"2025-06-25T09:10:38","slug":"new-call-for-solar-battery-grants-up-to-85-subsidy","status":"publish","type":"post","link":"https:\/\/www.solventa6.com\/en\/new-call-for-solar-battery-grants-up-to-85-subsidy\/","title":{"rendered":"New call for solar battery grants: up to 85% subsidy"},"content":{"rendered":"<p data-start=\"129\" data-end=\"442\">The Ministry for the Ecological Transition has launched, through IDAE and with European FEDER funds, a new call for grants to support innovative <strong>energy storage projects<\/strong> <strong>linked to renewable energy sources<\/strong>.<\/p>\n<p data-start=\"129\" data-end=\"442\">This funding line is part of the <strong data-start=\"369\" data-end=\"441\">PERTE for Renewable Energies, Renewable Hydrogen, and Storage (ERHA)<\/strong>.<\/p>\n<p data-start=\"444\" data-end=\"608\"><strong data-start=\"444\" data-end=\"495\">Application deadline: July 15, 2025, at 2:00 PM<\/strong><br data-start=\"495\" data-end=\"498\" \/>Grants are awarded through a competitive process, so both technical quality and submission timing are crucial.<\/p>\n<h3 data-start=\"615\" data-end=\"667\"><strong data-start=\"619\" data-end=\"667\">What can be subsidized and key requirements?<\/strong><\/h3>\n<ul>\n<li data-start=\"671\" data-end=\"735\">Only the battery (storage system) is eligible for the subsidy.<\/li>\n<li data-start=\"738\" data-end=\"776\"><strong data-start=\"738\" data-end=\"773\">Maximum eligible cost: \u20ac250\/kWh<\/strong>.<\/li>\n<li data-start=\"779\" data-end=\"920\">The system must be <strong data-start=\"798\" data-end=\"842\">hybridized with renewable energy sources<\/strong> (fossil fuels, aerothermal systems, and off-grid systems are not eligible).<\/li>\n<li data-start=\"923\" data-end=\"979\">A <strong data-start=\"925\" data-end=\"953\">minimum battery capacity<\/strong> is required to qualify.<\/li>\n<li data-start=\"982\" data-end=\"1100\"><strong data-start=\"982\" data-end=\"1006\">Eligible applicants:<\/strong> Large industrial consumers, SMEs with self-consumption, and entities with storage projects.<\/li>\n<li data-start=\"1103\" data-end=\"1221\"><strong data-start=\"1103\" data-end=\"1134\">Cybersecurity requirements:<\/strong> Servers must be located within the EU and comply with <strong data-start=\"1189\" data-end=\"1218\">NIS2\/311\/2022 regulations<\/strong>.<\/li>\n<li data-start=\"1224\" data-end=\"1282\">The <strong data-start=\"1228\" data-end=\"1281\">subsidy percentage depends on the geographic area:\u00a0<\/strong><\/li>\n<\/ul>\n<h3 data-start=\"1289\" data-end=\"1337\"><strong data-start=\"1293\" data-end=\"1337\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4349\" src=\"https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3.jpg\" alt=\"\" width=\"2000\" height=\"1414\" srcset=\"https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3.jpg 2000w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3-300x212.jpg 300w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3-1024x724.jpg 1024w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3-768x543.jpg 768w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/3-1536x1086.jpg 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/>Criteria to improve your project\u2019s score<\/strong><\/h3>\n<p data-start=\"1339\" data-end=\"1445\">Beyond the basic requirements, your project may receive a higher score if it meets the following criteria:<\/p>\n<ul>\n<li data-start=\"1449\" data-end=\"1511\"><strong data-start=\"1449\" data-end=\"1475\">European manufacturing<\/strong> of the battery or its components.<\/li>\n<li data-start=\"1514\" data-end=\"1659\"><strong data-start=\"1514\" data-end=\"1547\">Permits processed before 2025<\/strong>, including access point, environmental impact declaration (EID), construction license, land use permits, etc.<\/li>\n<li data-start=\"1662\" data-end=\"1851\"><strong data-start=\"1662\" data-end=\"1732\">Contribution to the European value chain and industrial resilience<\/strong>: A minimum of <strong data-start=\"1747\" data-end=\"1759\">3 points<\/strong> in this category is required; projects scoring below this threshold will be disqualified.<\/li>\n<li data-start=\"1854\" data-end=\"1936\"><strong data-start=\"1854\" data-end=\"1885\">Location in a priority area<\/strong> as defined by <strong data-start=\"1900\" data-end=\"1933\">REE (Red El\u00e9ctrica de Espa\u00f1a)<\/strong>.<\/li>\n<li data-start=\"1939\" data-end=\"2047\"><strong data-start=\"1939\" data-end=\"1975\">Grid-forming system capabilities<\/strong>: Technological innovations that help stabilize the grid will be valued.<\/li>\n<\/ul>\n<h3 data-start=\"2054\" data-end=\"2093\"><strong data-start=\"2058\" data-end=\"2093\">What does Solventa6 do for you?<\/strong><\/h3>\n<p data-start=\"2095\" data-end=\"2182\">As a renewable energy engineering firm, <strong data-start=\"2135\" data-end=\"2181\">Solventa6 takes care of the ENTIRE process<\/strong>:<\/p>\n<ul>\n<li data-start=\"2186\" data-end=\"2252\">We <strong data-start=\"2189\" data-end=\"2232\">design the most suitable storage system<\/strong> for your company.<\/li>\n<li data-start=\"2255\" data-end=\"2323\">We <strong data-start=\"2258\" data-end=\"2320\">prepare all the technical and administrative documentation<\/strong>.<\/li>\n<li data-start=\"2326\" data-end=\"2391\">We <strong data-start=\"2329\" data-end=\"2355\">manage the application<\/strong> to optimize your project\u2019s score.<\/li>\n<li data-start=\"2394\" data-end=\"2459\">We <strong data-start=\"2397\" data-end=\"2422\">implement the project<\/strong>: from installation to commissioning.<\/li>\n<\/ul>\n<p data-start=\"2461\" data-end=\"2544\">All you have to do is let us know you&#8217;re interested \u2014 <strong data-start=\"2515\" data-end=\"2543\">we take care of the rest<\/strong>.<\/p>\n<h3 data-start=\"2551\" data-end=\"2614\"><strong data-start=\"2555\" data-end=\"2612\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4461\" src=\"https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9.jpg\" alt=\"\" width=\"2000\" height=\"1414\" srcset=\"https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9.jpg 2000w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9-300x212.jpg 300w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9-1024x724.jpg 1024w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9-768x543.jpg 768w, https:\/\/www.solventa6.com\/wp-content\/uploads\/2025\/06\/9-1536x1086.jpg 1536w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/>Want to know if your company qualifies for the grant?<\/strong><\/h3>\n<p data-start=\"2615\" data-end=\"2702\"><strong data-start=\"2615\" data-end=\"2674\">Contact us today and receive a free viability analysis:<\/strong><\/p>\n<p data-start=\"2814\" data-end=\"2969\"><a href=\"mailto:info@solventa6.com\" rel=\"noopener\">info@solventa6.com<\/a><\/p>\n<p>More information:<br \/>\n<a href=\"https:\/\/www.idae.es\/noticias\/el-idae-lanza-700-millones-en-ayudas-para-almacenamiento-energetico-gran-escala\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.idae.es\/noticias\/el-idae-lanza-700-millones-en-ayudas-para-almacenamiento-energetico-gran-escala&amp;source=gmail&amp;ust=1749651433065000&amp;usg=AOvVaw2KdVzzrk89eDmhEOwYB7bi\">El IDAE lanza 700 millones en ayudas para almacenamiento energ\u00e9tico a gran escala | Idae<\/a><\/p>\n<p><a href=\"https:\/\/www.boe.es\/boe\/dias\/2025\/05\/29\/pdfs\/BOE-A-2025-10668.pdf\" target=\"_blank\" rel=\"noopener\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.boe.es\/boe\/dias\/2025\/05\/29\/pdfs\/BOE-A-2025-10668.pdf&amp;source=gmail&amp;ust=1749651433065000&amp;usg=AOvVaw1mScdKDl-KLP50aPLS7psm\">Disposici\u00f3n 10668 del BOE n\u00fam. 129 de 2025<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry for the Ecological Transition has launched, through IDAE and with European FEDER funds, a new call for grants to support innovative energy storage projects linked to renewable energy&#8230;<\/p>\n","protected":false},"author":4,"featured_media":4318,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[57,42],"tags":[369,268,367,203,269,197,191,210,194,192,190,368],"class_list":{"0":"post-4341","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-corporate-news","8":"category-industry-news","9":"tag-battery","10":"tag-energia-solar-en","11":"tag-energy-storage","12":"tag-engineering","13":"tag-epc-en","14":"tag-installation-en","15":"tag-photovoltaic","16":"tag-project","17":"tag-renewable-energy","18":"tag-solar-energy","19":"tag-spain","20":"tag-storage-system"},"_links":{"self":[{"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/posts\/4341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/comments?post=4341"}],"version-history":[{"count":3,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/posts\/4341\/revisions"}],"predecessor-version":[{"id":4467,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/posts\/4341\/revisions\/4467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/media\/4318"}],"wp:attachment":[{"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/media?parent=4341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/categories?post=4341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solventa6.com\/en\/wp-json\/wp\/v2\/tags?post=4341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}