Installation of a 7-meter-high, 9.2 MW biomass boiler in an industrial building of an industry dedicated to the manufacture of food supplements.
Solventa6 has been responsible for the basic, executive and construction management project for the installation of the biomass boiler and the structural calculation of the roof of the building where the boiler will be housed.