At Solventa6, we have reached a sponsorship agreement with Uni Girona for this season. As a company committed to sports and equality, we support women’s sports and believe in the values of effort,…
At Solventa6, we have reached a sponsorship agreement with Uni Girona for this season. As a company committed to sports and equality, we support women’s sports and believe in the values of effort,…
The structure of the single-family home in Vilablareix has been completed. It is an isolated house with a ground floor, first floor and basement. We have carried out the architectural…
A new photovoltaic solar plant for self-consumption is under construction on the roof of the Màgic Badalona shopping center. The installed power will be 1 MWp and the total surface…
The construction of 3 new grain silos in Vilamacolum has already begun. These are 3 silos with a total capacity of 3,200 Tm for grain storage with an aeration system…
In November, a 130 kWp plant was put into operation at the metal construction company METALL-LÒGIC in Cassà de la Selva. The plant will produce 486,000 kWh annually and will…