In November, a 130 kWp plant was put into operation at the metal construction company METALL-LÒGIC in Cassà de la Selva. The plant will produce 486,000 kWh annually and will reduce CO2 emissions into the atmosphere by 184 Tm per year.
SOLVENTA 6 has carried out the turnkey installation, which includes a feasibility study, design and calculation engineering, assembly, commissioning, legalization, maintenance and continuous monitoring of the installation.